Infrastructure Upgrades Progress

It’s been a while since I have posted an update to the blog as most activity goes straight to YouTube, in this post I’ll link a couple of my latest videos. The infrastructure upgrade project is moving along nicely and I have a self imposed deadline to get a lot of it done. To recap what is being done:

  • Adding electrical outlets throughout the yard
  • Adding electric to the chicken coop and future garden and potting shed areas
  • Adding artesian well spigots around the property including the new garden area and potting shed
  • Extending house water to the new garden area and potting shed

The electric being added has both hot (always on) and switched (timed to go on at night) outlets. There is also two dedicated circuits, one for a future electric gate and one for a well water pump and pond aerator.

Here’s a video I posted about two weeks ago where the trenching had begun:

And here’s a more recent one:

I have a deadline of November 9th to have a majority of this in place, we are having a big house party and I want to have the electric working so the yard can be lit up. The race is on!

To save some cost I purchased a used trencher and will be selling it after the work is done, renting one would have cost around a grand since I am slow at it and have to trench when I find spare time. Once this phase of the project is done I’ll do a walk through of the improvements.

Back to work for me, gotta get this done!

Leave a Reply