Upcoming Projects

Last week I posted my views on homesteading, prepping, and self sufficiency which are all goals for Three Acre Paradise. While those are all part of the big plan, there’s also some other things that are very important when working towards these. Low maintenance, aesthetics, and convenience are all key items. I like to build things so they don’t require a lot of work to maintain, otherwise I’d be spending my time with weekly chores rather than enjoying the property and working on new projects. They must fit in and be pleasing to look at to help create a relaxing and low stress environment. That’s what Paradise is all about.

Here is an overhead view of the property as it is today. The house, pond, and workshop are in the middle, the main road at the bottom and driveway leads up to the house and shop. The red border indicates the property line. The width of the property is about 230 feet, the depth is 550 feet.

property_plan_00

The top priority right now is to get the property fenced. I’ve had a lot of trouble with deer eating just about everything from the smallest plants to the larger fruit trees. They have chewed down vegetation, scraped bark off trees, and trampled through sensitive gardens. Secondary, the fence will keep our small animals in and others out. We have three small dogs and a flock of chickens that all seem attracted to the woody areas where predators like to hide. We’ve also had the neighbors dogs over feasting on the chickens, fencing should cure these problems. The first step is to fence the front and put up a gate, that has been contracted out and should be done in the next few weeks. The yellow lines show the approximate area for the this:

property_plan_01 - Fencing

Here’s what it looks like along the road. I’ve made sure the area is clear and level so the fence company shouldn’t run into any problems.

property_plan_02 - Fencing

The fence along the front will be a three board split rail made of vinyl, similar to this:

property_plan_03 - Fencing

The gate will be aluminum and eventually automated. Since the split rail does not keep smaller animals in or out I’ll have to put another layer of fencing behind it. This will be the same or similar to what is used on the remainder of the property. The only part that will remain un-fenced is a section along the back where there is a utility easement.

property_plan_04 - Fencing

The easement will allow animals (such as the deer) to easily pass between properties such as they do today and hopefully will keep them from thinking they have to jump over the fence. There’s already a good collection of wildflowers growing in that area, I’ll probably add seed for some other beneficial plants. I can’t put any trees back there in case the city has to dig to access the buried water main. Here’s what that area looks like today:

property_plan_05 - Fencing

The dirt mound is a raised and cleared path for the future fence, the utility easement is to the right. Since the neighbors yard behind me is fully fenced this access path is pretty important. The fencing that will be used will be a field fence such as this:

property_plan_06 - Fencing

Once the fencing is complete the focus will be on a new garden area. Here is where it will be on the property:

property_plan_07 - Garden

The garden will be approximately 40-50 feet per side. There will be a pergola running down the middle with supports to help with plants that like to be trellised. The garden area will also be fenced so there will be two layers of protection from larger animals. An electric wire will help discourage the smaller ones from climbing in. Here is what that area looks like today, it has already been cleared and prepped:

property_plan_08 - Garden

Next project will be a potting house on the pathway to the garden (PH on this drawing):

property_plan_09 - Potting House

This will be a work area for planting seeds and storing gardening supplies. I’m also thinking of adding a sitting area on the side facing the pond just as an area to relax. This area has also been prepped:

property_plan_10 - Potting House

Once the garden has been moved the old garden location will become a carport. I’ll have a concrete slab put down and a metal carport cover put in. This will have two parking places for whatever extra vehicles we have at the time (CP on drawing):

property_plan_11 - Carport

We could also use the carport area for parties and gatherings, it’s nice to have some additional shaded area due to the sun and unpredictable rains. This is what the garden looks like today, it has a shade cover and everything is planted in containers:

property_plan_12 - Carport

Yup that’s a lot so far, but the biggest stuff is done at this point. Timeline for these is by the end of 2020 but hopefully sooner. After these I’d like to build a fire pit and picnic area with paths leading to them (FP and PA):

property_plan_13 - Fire Pit

One more overhead to go, this one is pretty all inclusive. What I’ve added here is the current chicken coop on the left about mid way down, current aquaponic system behind the shop (AP), and a bunch of poorly drawn squiggly lines. Those lines are the approximate edge of the grass to natural areas. Basically, there will be grass parallel to the driveway, around the house, and partially around the pond. Everything outside that region will be gardens, food forest, walking paths, and other small coops or structures. The grass along the driveway will provide parking for when we have a lot of guests over.

property_plan_14 - All

There are a few other things to be built but I haven’t pinpointed the locations yet, this includes a quail area, tractor shed, mulch bins, and aquaponic expansion.

Some of the other projects that are planned are expansion of the solar power system, battery backup, antenna tower, shop storage, aquaponic improvements, seedling start experiments, growing microgreens, and more growth comparisons (EarthBox, aquaponic, grow bags, raised beds, in ground, others).

For more fun, I’ve got some ideas for a “live off the land challenge” where I consume only what the property produces for a day, three days, and eventually a week. Planning for these are still in the works but I’ll post a timeline soon.

Stay tuned for next post in a couple of days, a six week check into the Aquaponic vs Earthbox challenge!

4 Replies to “Upcoming Projects”

    1. Thanks, yes this is a multi year project. Having the large established trees gives me a jump start as many things seem to do better with some shade.

Leave a Reply